Transverse Alignment
Loading (MAN) - ShuttleLoad (module 3a)
602701-9020-408
ZEISS shuttle station for manual loading system:
- high throughput and utilization of CMM due to simultaneous setup during the ongoing measurement.
- fast, ergonomic feeding of pre-setup pallets by manually shiftable feeding slide.
- protection of CMM by mechanical decoupling from shuttle station.
- height compensation for on-site floor unevenness using levelling equipment at the aluminum profile.
Recently Viewed
Loading (MAN) - ShuttleLoad (module 3a)
602701-9020-408
€ 24,650.00excl. VAT
Shipment within > 30 Working days
Complete reference sphere kit, DK 25, 105 mm, M6 base
600332-9486-000
€ 702.40excl. VAT
Shipment within 2 Working days
Stylus straight M5, DK5 L105
000000-1073-344
€ 151.30excl. VAT
Shipment within > 30 Working days
Star stylus M3 XXT, DK0.6 L5
626103-0060-018
€ 243.50excl. VAT
Shipment within 2 Working days
Stylus straight M3 XXT, DK5 L50
626103-0503-050
€ 73.90excl. VAT
Shipment within 19 Working days
Adapter plate extension, Cube-5x-M5-L146,5
626107-2100-210
€ 277.40excl. VAT
Shipment within 20 Working days
T-stylus, DK1 L65
626111-5000-071
€ 151.30excl. VAT
Shipment within 17 Working days
Stylus stepped, DK0.4 L15
626111-0041-015
€ 120.00excl. VAT
Shipment within 17 Working days
Stylus straight M3, DK8 L104
626120-0155-000
€ 134.80excl. VAT
Shipment within 24 Working days